The internal work is complete… 7 windows left to be installed

The Internal work was competed on Friday. Karen and I have been moving back in, unpacking boxes, moving furniture, and hanging art.

I had not mentioned that we extended the use of crown molding to the hallway, living room, and dining room.

We needed to do this to keep this part of the house consistent. We also changed the wall color from the original blue to the same Revere pewter that we used in the MBR. It looks much cleaner and we are still impressed with the paint’s ability to change color, depending on the incoming light.

05132013 031 05132013 034 05132013 035 05132013 036

DSC_0171 DSC_0168

05132013 041 05132013 046 05132013 044 - Copy 05132013 048 05132013 043 - Copy

19 of the 26 windows have been installed and trimmed out. We have delayed the last 7 windows for the back part of the house, as we need to remove some furniture and make the windows more accessible.

I will have to disassemble my office and office desk as part of this work. We will restart this process mid June.

Leave a comment