Work continues and most of the new floors have been installed. They look AWESOME!
We have had recessed lights installed in the Master bedroom and we will also have a few installed in the dark blue room (Karen’s office) …
that will most likely be painted some shade of yellow.
A few of these lights will be pointed at the large black furniture pieces, like the armoire, the headboard and the tall chest of drawers (actually not black).
We will also have these lights on a dimmer switch, because I can’t stand “bright operating room lighting”.
The lights that were selected are dim-able LED lights.
We were surprised to find out that we had some dead space behind a wall located just outside of our master bedroom, that we can re-purpose and insert a small half closet.
We are really excited about this, as we removed a linen closet in the master bath when we installed the full 60″ inch wide shower. Kudos to the Leightons !!!